Main Street Improvements Conceptual Design

Paepcke Park is Aspen’s second busiest transit hub, with three bus stops as well as WE-cycle and Car-to-Go stations. The Paepcke Transit Hub Improvements Project seeks to improve safety for all users, enhance the function of existing services, and upgrade infrastructure to support emerging technology such as real-time digital signage for RFTA buses.

Work activities on the project include building a covered bus shelter, replacing utilities, including water lines, electrical, stormwater, and installation of conduits for future communications utilities, and installing an improved Main Street crossing for pedestrians.

Weather permitting, motorists can expect construction work on Main Street by Paepcke Park in Aspen Mondays through Fridays from 7:30 a.m. – 5:30 p.m., and intermittently on Saturdays from 9 a.m. – 5 p.m.

Traffic control plans include construction flaggers, vehicular lane shifts, and motorist, cyclist, and pedestrian detours. The project will not result in any changes to existing bus routing or service levels.

Questions, concerns, or kudos? Connect with us through Aspen 3-1-1 Connect.



Paepcke Park is Aspen’s second busiest transit hub, with three bus stops as well as WE-cycle and Car-to-Go stations. The Paepcke Transit Hub Improvements Project seeks to improve safety for all users, enhance the function of existing services, and upgrade infrastructure to support emerging technology such as real-time digital signage for RFTA buses.

Work activities on the project include building a covered bus shelter, replacing utilities, including water lines, electrical, stormwater, and installation of conduits for future communications utilities, and installing an improved Main Street crossing for pedestrians.

Weather permitting, motorists can expect construction work on Main Street by Paepcke Park in Aspen Mondays through Fridays from 7:30 a.m. – 5:30 p.m., and intermittently on Saturdays from 9 a.m. – 5 p.m.

Traffic control plans include construction flaggers, vehicular lane shifts, and motorist, cyclist, and pedestrian detours. The project will not result in any changes to existing bus routing or service levels.

Questions, concerns, or kudos? Connect with us through Aspen 3-1-1 Connect.



Share on Facebook Share on Twitter Share on Linkedin Email this link

Place a Pin

over 4 years

Place a pin and leave a comment about what you would like to see changed to improve the safety, function and/or experience of this transit hub. Be sure to leave a comment with details.

Possible Considerations for Conceptual Design:
  • Lighting
  • Signage
  • Designated Bus Shelters
  • Striping
  • Crosswalks
  • Seating
  • Drainage
  • Sight lines
  • Other – what do you envision? 